Page 30 - MMI-Oct2022- upload
P. 30

As Industry                                                                                          Source: Ace Robotics Pvt Ltd
           4.0 becomes
           a basic
           need for any
           standard      and the cost is an issue in the cur-                        in the 3 kg segment with dual
           manufactur-   rent working capital crisis for all   Challenges and plan   models. We are working on
           ing facility   MSME companies.              of action                     newer models  that  support
                                                       “As  a  technological  company,
           around the
           world, auto-  To make the robot suitable for   difficulties and improvements   higher payloads and on 6 kg
           mation and    the needs of the MSME, Chakra-  have  always  been  a  part  of   and 12 kg models, keeping in
           robotics will   varthy reveals, “We have    our operations, and with our   mind that the cost needs to be
           be the go-to   launched the i+ series family,   highly  skilled  engineers  and   very low, and we have planned
           solutions     which are 6-axis, 360-degree   technicians, we have always   to launch these bots before
           for ensuring   rotating robots with a  1,000-  identified innovative solutions   the end of this year.” He further
           efficient,    mm  reach and a  payload  up   to overcome technical con-   mentions, “We have purchased
           timely,       to  3 kg, namely the i+Lite and   straints,” informs Chakravarthy.   an  industrial plot and  are
           and quality   i+Duo.  While  the  i+Lite  is  de-  “In the course of development,   progressing towards setting
           production    signed for single robot, single   we have come a long way from   up a world-class bot manu-
           in such a     machine tending operations for   single-thread  processing  to  facturing plant in Chennai
           time- and
           price-sensi-  24/365 days of product or batch    multi-thread processing, adap-  with all possible reverse and
           tive industry.  manufacturing with recurrent   tive error compensation at the   forward engineering possibili-
                         schedules, the i+Duo is de-   firmware level, and a secured   ties in-house to ensure we have
                         signed and built for dual ma-  data  packet  format  to  prevent   absolute control on the prod-
                         chine tending tasks with a sin-  any software corruption.”  ucts and solutions we offer to
                         gle robot, allowing for extended   He  reveals  his  future  plans,   our clients at the best affordable
                         machining cycle times.”       “Currently, we are operating   price point.”


                          Who did you notice more?











           For Advertising Contact:
           Murali Sundaram: +91 9740048390
           murali.sundaram@magicwandmedia.in




          30  |  November-December 2022                                                  Modern Manufacturing India
   25   26   27   28   29   30   31   32   33   34   35